Wet heath re-instatement project monitored by WSI

Figure 2 Construction a

Appearance of wet heath along proposed route of under ground cable prior to commencement of works.

Figure 2 Construction b

Excavation of cable trench.

UseOfBogMats

Bog “mats” used to store surface scaws during works and prior to re-instatement.

Figure 2 Construction c

Works being undertaken on installation of underground power cable.

Appearance of re-instated scraws after underground power cable installed.

WetHeathReinstatement V2

UAV survey of underground power cable route three months after wet heath re-intstament.